Call (770) 464-5332 235 Peachtree St, Atlanta, GA

Four layers, one plan.

A design covers each of these in the order a crew would build them. Your project might touch one layer or all four, and a first call sorts out which.

Grade & drainage

How the ground is shaped, and where rain goes once it lands.

  • Slope and low spots that hold standing water
  • Water moving toward the foundation instead of away
  • Downspout runoff and where it ends up
  • Hillside yards that wash out in heavy storms

Why it's first: everything else sits on this layer. Atlanta's red clay drains slowly, so a patio or bed set on a bad grade usually fails from underneath.

Hardscape

The built surfaces: what you walk on, sit on and lean against.

  • Walkways and steps that connect the house to the yard
  • Patios and seating areas sized for how you actually use them
  • Retaining walls where a slope needs holding back
  • Edging that keeps beds, gravel and lawn apart

Why it's second: heavy equipment and stone deliveries come through here. Doing this before planting means nothing new gets crushed.

A flagstone path with two broad steps running between clipped green hedges under tall trees
A flagstone path and steps between hedges. Stock photo — not an actual job by this company.

Planting

What grows where, chosen for the light and soil each spot actually gets.

  • Bed layout and plant selection by sun and shade
  • Trees placed for screening, shade or a focal point
  • Lawn areas, or alternatives where grass struggles
  • Spacing for how big plants get, not how big they arrive

Why it's third: plants go into finished grade beside finished edges. Planted earlier, they get trampled or buried during the work above.

Lighting & finish

How the space reads after dark, plus the last details that pull it together.

  • Path and step lighting so you can use the yard at night
  • Uplighting on trees and the front of the house
  • Mulch, gravel and top dressing
  • A final walk-through against the plan

Why it's last: fixtures get aimed at plants and surfaces that already exist. Wire laid too early tends to get cut by a shovel.

Not sure which layer you need?

Describe the problem and we'll tell you where it starts.